{"id":4463,"date":"2024-02-23T09:23:45","date_gmt":"2024-02-23T09:23:45","guid":{"rendered":"https:\/\/www.mtnewstoday.com\/en\/?p=4463"},"modified":"2024-02-23T09:23:47","modified_gmt":"2024-02-23T09:23:47","slug":"moe-kaung-hpakan-66-kv-power-line-which-was-damaged-by-the-fighting-of-pdf-has-been-completed-50-of-the-repairing-work","status":"publish","type":"post","link":"https:\/\/www.mtnewstoday.com\/en\/?p=4463","title":{"rendered":"Moe Kaung- Hpakan 66 KV power line which was damaged by the fighting of PDF has been completed 50% of the repairing work"},"content":{"rendered":"\n<p>23 February 2024<\/p>\n\n\n\n<p>The Electrical Engineering Office (Phakan) told MT News that 50% of the repair work on the Moe Kaung- Phakan 66 kV power line damaged by the fighting of the PDF has been completed, so electricity will be restored to Phakan by the end of February.<\/p>\n\n\n\n<p>It is reported that the 66 KV Moe Kaung-Phakan line, which is maintained by the Office of National Grid (Waingmaw), has been a lot of damage to the 66 KV power line after the fighting of the PDF that took place in Nant Thein Village, PhaKan Township on February 4th.<br>More than one million people who live in Phakan Township. As the electricity goes on for a long time, the city is facing difficulties, from small to large enterprises.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"692\" height=\"881\" src=\"https:\/\/www.mtnewstoday.com\/en\/wp-content\/uploads\/2024\/02\/photo_2024-02-23_15-44-35.jpg\" alt=\"\" class=\"wp-image-4464\" style=\"width:835px;height:auto\" srcset=\"https:\/\/www.mtnewstoday.com\/en\/wp-content\/uploads\/2024\/02\/photo_2024-02-23_15-44-35.jpg 692w, https:\/\/www.mtnewstoday.com\/en\/wp-content\/uploads\/2024\/02\/photo_2024-02-23_15-44-35-236x300.jpg 236w, https:\/\/www.mtnewstoday.com\/en\/wp-content\/uploads\/2024\/02\/photo_2024-02-23_15-44-35-9x12.jpg 9w\" sizes=\"auto, (max-width: 692px) 100vw, 692px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>23 February 2024 The Electrical Engineering Office (Phakan) told MT News that 50% of the repair work on<\/p>\n","protected":false},"author":4,"featured_media":4464,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[],"class_list":["post-4463","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-crime"],"_links":{"self":[{"href":"https:\/\/www.mtnewstoday.com\/en\/index.php?rest_route=\/wp\/v2\/posts\/4463","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mtnewstoday.com\/en\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mtnewstoday.com\/en\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mtnewstoday.com\/en\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mtnewstoday.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4463"}],"version-history":[{"count":1,"href":"https:\/\/www.mtnewstoday.com\/en\/index.php?rest_route=\/wp\/v2\/posts\/4463\/revisions"}],"predecessor-version":[{"id":4465,"href":"https:\/\/www.mtnewstoday.com\/en\/index.php?rest_route=\/wp\/v2\/posts\/4463\/revisions\/4465"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mtnewstoday.com\/en\/index.php?rest_route=\/wp\/v2\/media\/4464"}],"wp:attachment":[{"href":"https:\/\/www.mtnewstoday.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4463"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mtnewstoday.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4463"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mtnewstoday.com\/en\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4463"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}